A clear ACP request for quotation helps manufacturers price the same product, deliver the right documents and avoid late substitutions. “Please quote 4 mm aluminum composite panel” is not enough for a reliable comparison because skin thickness, core, coating, size and fabrication can vary substantially. This guide shows how to prepare an aluminum composite panel RFQ for FEITENG or another supplier, from application and drawings to samples, testing, packaging and delivery terms.
Start with the real use: exterior facade, interior wall, bathroom, kitchen splashback, signage, digital printing, vehicle or marine component. Describe building or operating conditions, indoor or outdoor exposure, coastal or industrial pollutants, expected service period and applicable standards. This information lets the manufacturer identify a suitable range rather than guessing from a sheet name. A facade buyer can begin with building grade ACP, while advertisers may need digital printing grade ACP. Do not request a fire class without identifying the required test standard and project jurisdiction.

List total thickness, aluminum skin thickness, alloy or temper when required, core type, front and back coatings, color, gloss and surface texture. State sheet width and length, acceptable tolerances and any protective-film requirement. Separate polyester coating from polyethylene core to avoid the common “PE” ambiguity. If an alternative is acceptable, define which variables may change and which require approval. For example, a different coating cannot be treated as equal merely because the color matches. Ask the supplier to repeat the offered construction in the quotation so discrepancies are visible before order confirmation.
State whether quantities refer to stock sheets, square metres or finished components. Include a cutting list with dimensions and finishes, plus drawings for routing, folding, holes, stiffeners or curved sections. Mark critical tolerances and visible faces, and group items by elevation or installation batch where color consistency matters. Fabrication yield affects price, so a finished cassette quotation should not be compared directly with a stock-sheet price. Identify who supplies tooling, sub-framing and accessories. If the design is still provisional, request budget and final quotations separately instead of presenting an early estimate as a fixed production offer.
Name the required datasheet, coating evidence, fire reports, warranty, inspection documents and any market-specific declarations. Reports should match the offered product and scope. Ask for physical color and finish samples, and define whether a pre-production or fabricated mock-up is required. For regulated applications, agree how batches will be identified and which tests may be repeated at receiving. Our fire-rated ACP guide explains document terminology, while the ACP price guide helps separate material and project costs. Samples support approval but do not replace production traceability.
Specify destination, Incoterm or delivery basis, required date, unloading conditions and any container or pallet limits. Discuss protective packaging for decorated faces, formed parts and sea freight, and ask how labels connect panels to batches. Confirm payment terms, quotation validity, tooling charges, minimum order quantity, production lead time and the treatment of approved changes. Delivery promises should distinguish manufacturing time from transport and customs. Include a contact for technical clarifications so the supplier does not make silent assumptions. A slightly higher offer with clear documents and packaging may present lower project risk than an incomplete low price.

| RFQ field | Supplier must confirm | Common mismatch |
|---|---|---|
| Construction | Total thickness, skins, core and coating | Same total thickness, thinner skins |
| Finish | Color, gloss, texture and batch | Screen color treated as approval |
| Quantity | Sheets, square metres or fabricated parts | Different cutting-yield assumptions |
| Evidence | Reports, warranty and batch records | Generic or unrelated documents |
| Delivery | Packaging, lead time and trade terms | Production time confused with arrival |
Ask whether the quotation includes fabrication, protective film, pallets, documentation and replacement of transport-damaged panels. Confirm how color variation, dimensional tolerance and nonconforming material are handled. If a supplier offers an equivalent product, request a side-by-side construction table and revised evidence. Clarify whether samples come from regular production and how the approved finish will be retained. These questions are not administrative extras; they determine whether the offered material can be manufactured, inspected and installed without an unexpected change in cost or performance.
Once an offer is selected, attach the final quotation, samples, drawings and document revisions to the purchase order. Record approval responsibility and dates. Any later change to skin, core, coating, dimensions or packaging should receive written review before production. Keep technical and commercial discussions connected so a discount does not quietly alter the specification. For complex facades, review FEITENG technical resources and relevant ACP project cases during design coordination, while treating current signed documents as the controlling record.
State the quotation currency and identify which duties, taxes and freight charges are included. For international orders, compare the same delivery basis and payment milestones. A unit price alone does not show the landed project cost. Keep banking and contractual details in approved company channels.
Include sample delivery, technical comments and mock-up review in the purchasing schedule. Production should begin only after the required approvals are recorded. If the project date is urgent, ask which steps can run in parallel without removing essential checks.
Remove superseded drawings from the order package and give the final version a clear revision number. This reduces the risk of pricing or producing different designs.
For repeat orders, reference the original approved product but still confirm revision dates, color batch and current lead time. Do not assume that a previous quotation remains technically or commercially valid without written confirmation.
Provide application, dimensions, quantity, total and skin thickness, core, coating, color and destination. Add fire standards, fabrication drawings and required documents where relevant. More detail produces a more comparable offer.
Use the unit that matches the supply scope and show both when helpful. Stock sheets need dimensions and sheet counts; fabricated components need drawings and piece counts. State waste and cutting-yield assumptions.
Skin gauge, core, coating, size, fabrication, testing, packaging and delivery terms can all differ. Compare complete constructions and commercial scopes before assuming that one supplier is simply cheaper.
Yes, if alternatives are clearly identified and approved. Require a construction comparison, revised documents and samples where needed. Silent substitution creates quality and compliance risks.
Allow time for technical documents, physical samples, fabrication review and logistics. Complex or regulated projects need longer than stock-sheet orders. Keep quotation validity and project deadlines aligned.
FEITENG has manufactured metal composite panels since 1994 and supports application-based product selection. This RFQ guide is general procurement advice, not a binding offer. To receive a project-specific quotation, send your ACP RFQ to FEITENG with drawings, quantities, destination and applicable standards.
Zhangjiagang Feiteng New Composite Materials Co., Ltd.
Address:No.77 Huada Road, Environmental & New Material Industry Park, Bonded Port Zone, Zhangjiagang City, Jiangsu, China
Phone:+86 18151586877
E-mail:info@feitengacp.com
COPYRIGHT © Feiteng All RIGHTS RESERVED.